Latest News

 

18th July 2010

 

Today saw us removing the smoke box door. Nick has been busy with the gas axe on the boiler mounting brackets. Most of the bolts in the smoke box have been burned out so a trial lift of the boiler shouldn't be to far away.

 

13th June 2010

 

The top frame for the drag box was trial fitted and drilled today. It will need to be removed again for some further machining work to be carried out to allow the damper controls to be fitted.

 

9th May 2010

 

A lot has happened in the background over the last month. The under keeps have been cast for the bogie truck. The originals were missing from the engine being a very removable part in Barry yard.  

 

A quote for the springs for the whole engine has been received and the top frame for the drag box has been made. This will be drilled in the next few weeks along with the angle irons. So far about half of the drag box has been remade.

 

The steel for the spring hangers has been sourced and the float for the tender water tank overhauled, and the missing parts made in stainless steal. 

 

28th March 2010

 

With some empty siding space allowing us vehicle access, today saw the dismantling of the bogie truck. The bogie came apart as planned. First the top centre casting was removed. Having cut out all the fitted bolts we were then able to remove the horn guides, wheel sets and the axle boxes. We are now faced with a kit of parts that i'm sure airfix would be proud of.

 

Stamps on the axle boxes show they were fitted to no less than three engines before becoming into use on 5967.

 

14th February 2010

 

On Sunday work was split between removal of the tender buffer beam and starting to dismantle the bogie truck.

 

      

 

13th February 2010

 

Saturday saw the removal of the bogie truck.

 

 

        

 

 

 

 

 